{"id":2567,"date":"2026-10-07T06:00:00","date_gmt":"2026-10-07T06:00:00","guid":{"rendered":"https:\/\/noorsilk.com\/"},"modified":"2026-09-28T07:27:10","modified_gmt":"2026-09-28T07:27:10","slug":"hijab-reorder-planning","status":"publish","type":"post","link":"https:\/\/noorsilk.com\/ar\/hijab-reorder-planning\/","title":{"rendered":"\u0643\u064a\u0641\u064a\u0629 \u062a\u062e\u0637\u064a\u0637 \u0625\u0639\u0627\u062f\u0629 \u0637\u0644\u0628 \u0627\u0644\u062d\u062c\u0627\u0628\u0627\u062a \u062f\u0648\u0646 \u0645\u062e\u0632\u0648\u0646 \u0632\u0627\u0626\u062f"},"content":{"rendered":"<div class=\"ns-article-body\" lang=\"en-US\">\n<nav class=\"ns-article-toc\" aria-label=\"\u0641\u064a \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644\"><strong>\u0641\u064a \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644<\/strong><a href=\"#metrics\">Metrics<\/a><a href=\"#lead-time\">Lead time<\/a><a href=\"#roles\">SKU roles<\/a><a href=\"#quantity\">\u0627\u0644\u0643\u0645\u064a\u0629<\/a><a href=\"#decision\">Decisions<\/a><a href=\"#records\">Records<\/a><\/nav>\n<p><strong>A good hijab reorder plan balances stock availability with inventory risk.<\/strong> Do not reorder only because a product sells well or inventory looks low. Review current stock, committed units, open orders, sales velocity, sell-through, replenishment lead time, MOQ, seasonality, color and fabric role, margin, stock age and cash flow. The goal is to reduce both stockouts and excess inventory while keeping each decision tied to SKU-level evidence.<\/p>\n<div class=\"ns-answer-box\">\n<p class=\"ns-eyebrow\">Direct answer<\/p>\n<h2>When should a hijab brand reorder stock?<\/h2>\n<p>Start a reorder when projected available stock may fall below the quantity needed during the full replenishment period plus an appropriate safety allowance\u2014and only after checking continued demand, SKU role, season, MOQ, margin, cash and supplier conditions. No universal threshold works for every brand.<\/p>\n<\/div>\n<figure class=\"ns-article-figure ns-article-figure--wide\"><img decoding=\"async\" src=\"https:\/\/noorsilk.com\/wp-content\/uploads\/2026\/08\/hijab-collections-hero-v3.webp\" alt=\"Multi-color hijab collection arranged for SKU reorder planning\" \/><figcaption>Replenishment decisions should be made by SKU, not from collection totals alone.<\/figcaption><\/figure>\n<h2>What Is a Hijab Reorder Plan?<\/h2>\n<p>It decides which SKU to replenish, when to order, how much to buy and when to reduce or stop replenishment. It is not a copy of the first purchase order.<\/p>\n<h2>Why Reordering Is Different From the First Order<\/h2>\n<p>A first order tests assumptions; a reorder should use actual sales, stock, returns, customer feedback, channel results and timing. Compare this post-launch process with the <a href=\"https:\/\/noorsilk.com\/ar\/how-to-plan-a-hijab-test-collection\/\">initial hijab test-collection plan<\/a>.<\/p>\n<h2 id=\"metrics\">Start With SKU-Level Data<\/h2>\n<p>Record product, fabric, color, size, initial quantity, units sold, current stock, launch date and last reorder. Collection totals can hide one stockout and another slow-moving color.<\/p>\n<h2>Sell-Through Rate<\/h2>\n<p><strong>Sell-through rate = units sold \u00f7 units available \u00d7 100%.<\/strong> Time matters: 60% in seven days is not the same signal as 60% in ninety days. Do not apply one good\/bad threshold without role, season, stock depth and lead time.<\/p>\n<h2>Sales Velocity<\/h2>\n<p>A simple operating measure is units sold \u00f7 selling days. It shows movement per period but is not a complete demand forecast.<\/p>\n<h2>Days of Stock Remaining<\/h2>\n<p>Current stock \u00f7 average daily sales gives a simplified estimate. Campaigns, seasonality, price and future availability can change actual demand.<\/p>\n<h2>Sell-Through and Velocity Compared<\/h2>\n<div class=\"ns-article-table-wrap\">\n<table class=\"ns-article-table\">\n<thead>\n<tr>\n<th>Metric<\/th>\n<th>Simple calculation<\/th>\n<th>What it indicates<\/th>\n<th>Limitation<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sell-through<\/td>\n<td>Sold \u00f7 available \u00d7 100%<\/td>\n<td>Share of available stock sold<\/td>\n<td>Needs a time window<\/td>\n<\/tr>\n<tr>\n<td>Sales velocity<\/td>\n<td>Sold \u00f7 selling days<\/td>\n<td>Movement per period<\/td>\n<td>Can be distorted<\/td>\n<\/tr>\n<tr>\n<td>Days remaining<\/td>\n<td>Current stock \u00f7 average daily sales<\/td>\n<td>Simplified coverage<\/td>\n<td>Assumes similar future demand<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>What Is a Reorder Point?<\/h2>\n<p>It is the inventory level that triggers a new procurement cycle before stock is exhausted.<\/p>\n<h2>Simple Reorder Point Framework<\/h2>\n<p><strong>Reorder point = expected demand during replenishment lead time + safety stock.<\/strong> This is an educational planning framework, not a NoorSilk formula or the only forecasting model.<\/p>\n<h2 id=\"lead-time\">Why Lead Time Matters<\/h2>\n<p>A longer path from PO to sellable stock requires an earlier decision. Use the <a href=\"https:\/\/noorsilk.com\/ar\/hijab-production-lead-time\/\">hijab production lead-time framework<\/a>.<\/p>\n<h2>Production Lead Time vs Total Replenishment Lead Time<\/h2>\n<p>Factory production is only one interval. Total replenishment may include PO processing, approvals, production, QC, packing, shipping, customs and warehouse receiving.<\/p>\n<h2>Safety Stock<\/h2>\n<p>Safety stock absorbs demand or lead-time variation and sales spikes, but too much ties up cash and raises aging and markdown risk. No fixed percentage or number of weeks applies universally.<\/p>\n<h2 id=\"roles\">Core Colors vs Seasonal Colors<\/h2>\n<p>Core colors may support continuing replenishment; seasonal colors need timing discipline. Core does not mean always reorder, and seasonal does not mean never reorder. Use data with the <a href=\"https:\/\/noorsilk.com\/ar\/core-vs-seasonal-hijab-colors\/\">core, carryover, seasonal and test framework<\/a>.<\/p>\n<h2>Carryover and Test Colors<\/h2>\n<p>A carryover color may bridge collections if inventory, momentum and future relevance support it. A successful test can gain allocation; a weak test should not be replenished merely to meet MOQ.<\/p>\n<h2>Fabric and Size Variants<\/h2>\n<p>Black modal and black chiffon are separate demand signals. Analyze fabric \u00d7 color \u00d7 size; where sizes exist, review sales, stock and returns separately using the <a href=\"https:\/\/noorsilk.com\/ar\/hijab-sizes-dimensions\/\">hijab size guide<\/a>.<\/p>\n<h2>Sales Channel<\/h2>\n<p>E-commerce, boutiques, distributors and marketplaces may have different velocity, allocation and reorder cycles. Preserve channel-level context.<\/p>\n<h2>Wholesale Orders vs DTC Demand<\/h2>\n<p>A large distributor order can create a temporary spike without proving sustained consumer demand. Separate one-off bulk commitments from repeat DTC movement.<\/p>\n<h2>Seasonality and Campaigns<\/h2>\n<p>Weather, retail calendars, Ramadan, Eid, year-end or summer campaigns can shift timing, but campaign demand may not persist. Do not extrapolate a short period indefinitely or assume a festival determines color demand.<\/p>\n<h2>Core \/ Seasonal \/ Test Reorder Matrix<\/h2>\n<div class=\"ns-article-table-wrap\">\n<table class=\"ns-article-table\">\n<thead>\n<tr>\n<th>Role<\/th>\n<th>Typical logic<\/th>\n<th>Inventory risk<\/th>\n<th>Review focus<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0623\u0633\u0627\u0633\u064a<\/td>\n<td>Potential ongoing replenishment<\/td>\n<td>Overestimating permanence<\/td>\n<td>Stable demand and margin<\/td>\n<\/tr>\n<tr>\n<td>Carryover<\/td>\n<td>Continue across periods where relevant<\/td>\n<td>Weakening momentum<\/td>\n<td>Next-collection fit<\/td>\n<\/tr>\n<tr>\n<td>\u0645\u0648\u0633\u0645\u064a<\/td>\n<td>Replenish only within useful selling window<\/td>\n<td>Late arrival<\/td>\n<td>Remaining season<\/td>\n<\/tr>\n<tr>\n<td>Test<\/td>\n<td>Scale, hold or exit after evidence<\/td>\n<td>MOQ-driven overbuying<\/td>\n<td>Signal quality<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Inventory Age<\/h2>\n<p>One hundred units received last week and one hundred held for six months have different risk. Aging can signal weak demand, overbuying, unsuitable color or fabric, price or positioning issues.<\/p>\n<h2>Slow-Moving Inventory<\/h2>\n<p>Diagnose visibility, photography, pricing, listing, color role, fabric fit and season before choosing hold, bundle, promotion, markdown or retirement.<\/p>\n<h2>Stockout Risk<\/h2>\n<p>Stockouts can lose sales and disrupt campaigns, while excess safety stock has cost. Replenishment balances service level against inventory risk.<\/p>\n<h2>Cash Flow Matters<\/h2>\n<p>A fast seller should not consume all working capital. Consider other SKUs, new launches, supplier terms, freight, marketing and operating cash.<\/p>\n<h2 id=\"quantity\">MOQ and Reorder Quantity<\/h2>\n<p>MOQ is the supplier\u2019s minimum orderable amount; reorder quantity is the amount supported by business need. They can differ.<\/p>\n<h2>What If Need Is Below MOQ?<\/h2>\n<p>Reassess timing, cash and inventory risk. Possible discussions include waiting, combining colors if allowed, ready stock, consolidating later demand or simplifying SKU\u2014but never assume a supplier permits these options.<\/p>\n<h2>How to Calculate a Simple Reorder Quantity<\/h2>\n<p><strong>Target stock after replenishment \u2212 projected stock at arrival = planned reorder quantity.<\/strong> This simplified framework must also consider open POs, committed stock, seasonality, promotions, MOQ and cash.<\/p>\n<h2>Open Purchase Orders and Committed Stock<\/h2>\n<p>Available position is not on-hand stock alone. Consider on hand + on order \u2212 committed units. Stock reserved for wholesale customers is not fully available even if still in the warehouse.<\/p>\n<h2>New vs Mature SKUs<\/h2>\n<p>New SKUs have little evidence and higher forecast uncertainty; mature SKUs provide more history. They should not use identical confidence assumptions.<\/p>\n<h2>When History Misleads<\/h2>\n<p>Promotions, stockouts, price changes, campaigns, holidays and channel shifts distort averages. Historical sales are not guaranteed future demand.<\/p>\n<h2>Stockout-Distorted Data<\/h2>\n<p>If an item was unavailable for half a period, recorded sales may understate demand. Mark out-of-stock days rather than treating them as zero-interest days.<\/p>\n<h2>Promotion-Distorted Data<\/h2>\n<p>Separate promotional volume from normal demand before projecting a reorder.<\/p>\n<h2>Returns and Exchanges<\/h2>\n<p>High gross sales with high returns may not justify expansion. Review net demand and reasons such as quality, size or color expectations.<\/p>\n<h2>Customer Requests and Waitlists<\/h2>\n<p>Comments, messages and waitlists are useful signals but are not confirmed demand; combine them with transactions and stock behavior.<\/p>\n<h2>Margin and Reorder Priority<\/h2>\n<p>Margin can differentiate similar sellers, but product role, customer expectations and assortment integrity also matter.<\/p>\n<h2>ABC-Style Prioritization<\/h2>\n<p>Classify high-, medium- and lower-importance SKUs to focus management attention without forcing a fixed 80\/20 split.<\/p>\n<h2 id=\"decision\">Reorder Priority Matrix<\/h2>\n<div class=\"ns-article-table-wrap\">\n<table class=\"ns-article-table\">\n<thead>\n<tr>\n<th>Demand<\/th>\n<th>Stock<\/th>\n<th>Conditional action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>High<\/td>\n<td>Low<\/td>\n<td>High attention; validate reorder<\/td>\n<\/tr>\n<tr>\n<td>High<\/td>\n<td>High<\/td>\n<td>Monitor coverage<\/td>\n<\/tr>\n<tr>\n<td>Low<\/td>\n<td>High<\/td>\n<td>Avoid automatic reorder; diagnose<\/td>\n<\/tr>\n<tr>\n<td>Low<\/td>\n<td>Low<\/td>\n<td>Decide from strategic role and economics<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>When Should a SKU Be Reordered?<\/h2>\n<p>Look for continued demand, projected shortage before replenishment, healthy economics, relevant role, manageable MOQ, available cash and current supplier confirmation. No universal threshold applies.<\/p>\n<h2>When Should a Reorder Be Delayed or Stopped?<\/h2>\n<p>Delay where stock is sufficient, demand weakens, season ends, specifications or supplier will change, related inventory is excessive or cash is constrained. Stop where persistent weak demand, aging, returns, markdown dependence, poor economics or planned replacement outweigh strategic value.<\/p>\n<h2>When Should Quantity Increase or Decrease?<\/h2>\n<p>Increase cautiously after repeated successful cycles, stable demand, commitments and predictable lead time\u2014not one quick sellout. Reduce for slowing sales, older stock, shorter season, product transition, uncertainty or higher MOQ\/cost risk.<\/p>\n<h2>Reorder Color Consistency<\/h2>\n<p>Retain physical color reference, internal code, specification, previous sample and lot records. A new production lot cannot be guaranteed 100% identical; use the <a href=\"https:\/\/noorsilk.com\/ar\/color-variation-bulk-orders\/\">bulk color-consistency framework<\/a>.<\/p>\n<h2>Reorder Product Specifications<\/h2>\n<p>Do not write only \u201csame as last order.\u201d Cite product code, fabric, dimensions, color, artwork, labels, packaging and approved reference.<\/p>\n<h2>Packaging and Reorder Consistency<\/h2>\n<p>Confirm packaging version, barcode, channel insert and carton logic using the <a href=\"https:\/\/noorsilk.com\/ar\/pack-hijabs-international-wholesale-shipping\/\">export packing guide<\/a>. Update legal or label information where required.<\/p>\n<h2>Shipping Cost and Reorder Quantity<\/h2>\n<p>Small orders may have higher unit freight; larger orders can reduce frequency but raise inventory risk. Compare updated scope through the <a href=\"https:\/\/noorsilk.com\/ar\/compare-hijab-supplier-quotations\/\">supplier quotation guide<\/a>.<\/p>\n<h2>Air, Sea and Split Replenishment<\/h2>\n<p>Air may support urgent inventory at a different cost; sea supports another transit\/economic profile. A split may balance shortage and cost in some projects. No option is universal, and this guide provides no live rate or fixed transit time.<\/p>\n<h2>Supplier Capacity<\/h2>\n<p>Repeat orders can face changed material availability, queue, capacity or holiday conditions. Never assume the new lead time equals the previous order.<\/p>\n<h2 id=\"records\">Reorder Calendar<\/h2>\n<p>Track SKU, current and committed stock, average sales, lead time, safety-stock logic, reorder point, planned date, MOQ, quantity, expected arrival and status. Review cadence depends on velocity, SKU count, lead time and scale.<\/p>\n<h2>Illustrative Reorder Example<\/h2>\n<p><strong>Illustrative example only:<\/strong> current stock 120, average weekly sales 30 and replenishment lead time four weeks imply expected lead-time demand of about 120 units. Without safety stock, inventory may reach zero as replenishment arrives. This is not NoorSilk data, a universal formula or a fixed recommendation.<\/p>\n<h2>SKU Reorder Planning Table<\/h2>\n<div class=\"ns-article-table-wrap\">\n<table class=\"ns-article-table\">\n<thead>\n<tr>\n<th>SKU<\/th>\n<th>Role<\/th>\n<th>Sold<\/th>\n<th>\u0645\u062a\u0627\u062d<\/th>\n<th>Velocity<\/th>\n<th>Lead time<\/th>\n<th>MOQ<\/th>\n<th>Action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product code<\/td>\n<td>Core\/seasonal\/test<\/td>\n<td>Period units<\/td>\n<td>On hand \u2212 committed + on order<\/td>\n<td>Chosen period<\/td>\n<td>Current estimate<\/td>\n<td>Supplier minimum<\/td>\n<td>Reorder\/monitor\/hold\/exit<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Stockout vs Overstock Risk<\/h2>\n<div class=\"ns-article-table-wrap\">\n<table class=\"ns-article-table\">\n<thead>\n<tr>\n<th>Risk<\/th>\n<th>Possible effect<\/th>\n<th>Control<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Stockout<\/td>\n<td>Lost sales or campaign interruption<\/td>\n<td>Lead-time visibility and trigger<\/td>\n<\/tr>\n<tr>\n<td>Overstock<\/td>\n<td>Cash tied up and aging<\/td>\n<td>SKU-level quantity discipline<\/td>\n<\/tr>\n<tr>\n<td>MOQ gap<\/td>\n<td>Buying beyond need<\/td>\n<td>Reassess options and timing<\/td>\n<\/tr>\n<tr>\n<td>Forecast distortion<\/td>\n<td>Wrong demand signal<\/td>\n<td>Flag stockouts and promotions<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<h2>Common Reorder Mistakes<\/h2>\n<ul class=\"ns-checklist\">\n<li>Repeating the first quantity.<\/li>\n<li>Reviewing only total sales.<\/li>\n<li>Ignoring stock, open POs, commitments, lead time or MOQ.<\/li>\n<li>Reordering every color equally.<\/li>\n<li>Treating one fast sellout as permanent demand.<\/li>\n<li>Ignoring season, age, returns, cash and freight.<\/li>\n<li>Ordering from comments alone.<\/li>\n<li>Waiting until stock is nearly zero.<\/li>\n<li>Using \u201csame as last order\u201d without references.<\/li>\n<li>Assuming lead time is unchanged.<\/li>\n<\/ul>\n<h2>Hijab Reorder Checklist<\/h2>\n<ol class=\"ns-checklist\">\n<li>Review SKU sales, stock, commitments and open POs.<\/li>\n<li>Calculate sell-through and velocity.<\/li>\n<li>Review age, returns, role and season.<\/li>\n<li>Confirm total replenishment lead time.<\/li>\n<li>Define safety-stock logic and reorder point.<\/li>\n<li>Estimate quantity and compare MOQ.<\/li>\n<li>Review cash, margin and supplier capacity.<\/li>\n<li>Confirm product, color and packaging references.<\/li>\n<li>Confirm shipping plan and place PO.<\/li>\n<li>Track arrival and review performance.<\/li>\n<\/ol>\n<figure class=\"ns-article-figure ns-article-figure--wide\"><img decoding=\"async\" src=\"https:\/\/noorsilk.com\/wp-content\/uploads\/2026\/08\/private-label-detail-v2.webp\" alt=\"Private-label hijab details arranged for reorder specification review\" \/><\/figure>\n<h2>Reorder Record Sheet<\/h2>\n<p>Save product code, SKU, fabric, color and role, size, current and committed stock, open PO, units sold, sell-through, velocity, stock age, lead time, safety logic, reorder point, MOQ, planned quantity, supplier, color reference, approved sample, packaging version, shipping method, PO date, expected completion and arrival, status and notes.<\/p>\n<h2>Move From Data to a Controlled Reorder<\/h2>\n<p>With sales history, current stock, lead-time data, SKU role and MOQ, identify candidates, retrieve references, request a current quotation and confirm the supplier schedule.<\/p>\n<div class=\"ns-article-cta\">\n<h2>Discuss a private-label hijab reorder<\/h2>\n<p>Share the SKU, quantity, specification, approved references, destination and required date for a project-specific review.<\/p>\n<p><a class=\"ns-button\" href=\"https:\/\/noorsilk.com\/ar\/oem-hijab-manufacturer\/\">Discuss a private-label project<\/a> <a class=\"ns-button ns-button--secondary\" href=\"https:\/\/noorsilk.com\/ar\/compare-hijab-supplier-quotations\/\">Review quotation scope<\/a><\/p>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u062f\u0644\u064a\u0644 B2B \u0644\u062a\u062d\u062f\u064a\u062f \u0623\u064a \u062d\u062c\u0627\u0628 \u064a\u064f\u0639\u0627\u062f \u0637\u0644\u0628\u0647 \u0648\u0645\u062a\u0649 \u0648\u0628\u0623\u064a \u0643\u0645\u064a\u0629 \u0645\u0639 \u0645\u0648\u0627\u0632\u0646\u0629 \u0627\u0644\u0646\u0641\u0627\u062f \u0648\u0627\u0644\u0641\u0627\u0626\u0636 \u0648MOQ \u0648\u0631\u0623\u0633 \u0627\u0644\u0645\u0627\u0644.<\/p>","protected":false},"author":1,"featured_media":1321,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[8],"tags":[118,101,115,116,117],"class_list":["post-2567","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buyer-guides","tag-demand-planning","tag-hijab-inventory","tag-hijab-reorder-planning","tag-stock-replenishment","tag-wholesale-operations"],"_links":{"self":[{"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/posts\/2567","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/comments?post=2567"}],"version-history":[{"count":1,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/posts\/2567\/revisions"}],"predecessor-version":[{"id":2570,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/posts\/2567\/revisions\/2570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/media\/1321"}],"wp:attachment":[{"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/media?parent=2567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/categories?post=2567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/noorsilk.com\/ar\/wp-json\/wp\/v2\/tags?post=2567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}